The smaller the drill, the tougher the job when drilling holes for running cable through your house’s framing. I’ve already discussed drills. When access is limited, a rightangle drill can be very advantageous. Your holes must be drilled at least 11/2 inches from the edge of the stud or joist! This is to avoid damage to the cable from drywall nails or screws or any other fastener used to attach anything to a wall or ceiling. If the studs are exposed, you should install a metal nailing plate in front of the hole for added protection.
Sunday, May 30, 2010
Get Your Drill Out
The smaller the drill, the tougher the job when drilling holes for running cable through your house’s framing. I’ve already discussed drills. When access is limited, a rightangle drill can be very advantageous. Your holes must be drilled at least 11/2 inches from the edge of the stud or joist! This is to avoid damage to the cable from drywall nails or screws or any other fastener used to attach anything to a wall or ceiling. If the studs are exposed, you should install a metal nailing plate in front of the hole for added protection.
The Woodwork Comes Off
Cutting very visible holes in your walls and ceilings (and repairing them later) might not be at the top of your list of fun projects. If you have wide baseboards, you might have a way out. You have to decide if it’s less of a mess to carefully remove a length of baseboard, pull the nails, reinstall, and possibly repaint it. With the baseboard out, you can drill behind it and not bother with patching up the plaster or drywall. This only works with wide baseboards (six inches wide and wider). With narrow baseboards, you would have to drill too close to the bottom of a stud, which could weaken it.
No Access, Now What?
Finished basements and attic spaces (or service panels located in finished garages) call for a more deft approach to your wiring. You have to decide if you should …
- Run part of the circuit in conduit across the basement or garage ceiling.
- Run conduit on the outside of your house and then into the walls.
- Tear into the walls and ceiling at regular intervals, exposing the studs and joist to run the cable.
Friday, April 30, 2010
Dealing with boxes in ceilings
Light fixtures and fans require an electrical box installed in the ceiling. (Fans are heavy and require special boxes. If you use anything else, the fan might fall out of the ceiling.) An unfinished attic gives you plenty of access to the joist. All you have to do is drill a small pilot hole at the proposed box location into the ceiling from below and poke a section of metal hanger up and into the attic (check the approximate location in the attic first for obstructions and wires). This will enable you to see if there are any obstacles in the attic such as existing wiring or framing that might be in the way of a box. Once you’ve established that the location will work, you can either …
- Cut the round hole for the box with a hole saw.
- Use a keyhole saw or a drywall saw for cutting the hole.
How to deal with plasters?
Plastering is quite a craft. Older plaster jobs consist of three coats of material applied over wood or metal lath. Some old plaster (Victorian homes come to mind) is a little on the crumbly side. If you’re careful cutting through it, you’ll keep your repairs to a minimum.
To cut through plaster …
- Determine the location of your new box (next to a stud if possible, but do your initial cutting at least a few inches away to make sure nothing gets in the way of the saw blade).
- Place a drop cloth or a piece of plastic on the floor.
- Drill a test hole so you can determine where the edge of the stud is located. (Ignore this if you’re not going to be near a stud.)
- Place the front of your new box against the plaster, and use a pencil to draw around it (ignoring any plaster ears) to give you a line to cut into. You can apply masking tape around the outline to help keep the plaster from chipping when you cut.
- Drill a hole in each corner to provide starter locations for the keyhole saw or scroll blade.
- Hold a straightedge against the pencil lines, and score the plaster several times with a sharp blade.
- Carefully saw through the lath in smooth movements. Go through about 7/8 of the way on one side and then cut the other side completely, returning to cut the remainder of the first side. This prevents the lath from excessively shaking the plaster.
How to deal with walls?
Running cable through finished walls or ceilings is a nuisance. Once you’ve determined that a circuit can be extended or a new one added, you should plan the circuit’s route and figure out the least-disruptive route for the cable. An existing circuit can be extended from an electrical box provided that …
- The box is sized to accommodate the additional cable.
- The box isn’t at the end of a switch loop (an end-of-the-run switch).
- The box isn’t a switch-controlled receptacle (unless you want the added device to be controlled by the switch as well).
What if you have wood flooring? If you cannot accurately determine where to drill from the basement, drill the smallest hole possible (with a drill bit about four inches long) near the edge of the baseboard. Push a piece of wire through the hole so you can find the location in the basement. A piece of scrap conductor from your NMB cable will work just fine. At the end of the job, fill in the hole with a putty stick in a color matching the floor stain.
Tuesday, March 30, 2010
How Much You Can Keep?
Basically, you can retain any and all safe wiring and devices. An electrical system will do what it’s designed to do and will do so reliably until you extend a circuit or the system beyond its design. You should remove or replace the following:
- Any corroded or damaged wiring
- Wiring that has not been installed properly (such as wire running along the bottom edge of an exposed joist rather than through holes drilled in the joist)
- Devices or fixtures that render a circuit unsafe
- Conductors that are the wrong gauge for their circuits
- Any cable rated for interior use but installed outdoors You might be getting more than you bargained for if your system has been repeatedly altered over the years.